یارا فایل

مرجع دانلود انواع فایل

یارا فایل

مرجع دانلود انواع فایل

پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

اختصاصی از یارا فایل پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری دانلود با لینک مستقیم و پر سرعت .

 

دسته بندی : پاورپوینت 

نوع فایل:  ppt _ pptx

( قابلیت ویرایش )

 


 قسمتی از اسلاید پاورپوینت : 

 

تعداد اسلاید : 27 صفحه

ارزیابی کیفیت اجرایی ماشین های حفاری Performance of roadheader The roadheader production rate and bit costs are controlled by several parameters including: Rock parameters, such as rock compressive and tensile strength, percent of hard and abrasive mineral content ( i.e.
quartz), rock fabric and matrix type, and elastic behavior of rock material etc. Ground condition, such as degree of fracture (RQD), joint condition, ground water, fault zones, rock mass classification and support requirements etc. Machine specification, including machine weight, cutterhead power, sumping, arcing, lifting, and lowering forces, cutterhead type(axial or transverse), bits type, size, and other characteristics, number and allocation of bits on the cutter head etc. Operational parameters, such as shape, size, and length of opening, inclination, sequence of cutting and enlargement operation, number of rock formations in the tunneling path, ground support method, and work schedule meaning of number of shifts per day and days per week etc.
1- machine parameter Solution for increasing of performance: Change in material and design of bits. Improve the machine design. Improve the cutterhead design.
The most important parameter to Improve the machine design is stability .
Improve the cutterhead design 2-Geomechanical parameter Case study in Turkey The Hereke Tunnel, located in Turkey in the city of Kocaeli next to Istanbul. The tunnel included 50 m of horizontal section ( 0–50 m), where excavation started up, and 225 m of 9 inclined section ( 50–275 m). sedimentary formations including dry ( 0–50 and 150–275 m) and wet sections (50–150). Excavation was performed by using a shielded roadheader, Herrenknecht-SM1 with 90 kW of cutter head power, in the excavation diameter of 3.48 m. Geological cross-section Effect of rock strength Samples taken from zone 5 have compressive strength of 210 kg/cm2 and specific energy of 11.2 MJ/m3, and samples taken from zone 6 have compressive strength values of 450 kg/cm2 and specific energy values of 16.3 MJ/m3.
This is reflected in instantaneous cutting rate values being 25 solid bank m3/cutting hour in zone 5 and 20 solid bank m3/cutting hour in zone 6. Other research The effect of wet sticky zone Zone 2 water ingress =11 1/min Al2O3 content=2.68 UCS=210kg/cm2 water absorption=3.8% ICR=50 m3/cutting hour Zone 3 water ingress =11 1/min Al2O3 content=15.10 UCS=210kg/cm2 water absorption=18.1% ICR=20 m3/cutting hour Effect of quartz content Roadheader performance analysis Result PR ( penetration rate)=distance excavated / time of excavation AR ( advance rate)= distance excavated / total time U ( utilization )= AR/PR (time of excavation / total

  متن بالا فقط قسمتی از اسلاید پاورپوینت میباشد،شما بعد از پرداخت آنلاین ، فایل کامل را فورا دانلود نمایید 

 


  لطفا به نکات زیر در هنگام خرید دانلود پاورپوینت:  توجه فرمایید.

  • در این مطلب، متن اسلاید های اولیه قرار داده شده است.
  • به علت اینکه امکان درج تصاویر استفاده شده در پاورپوینت وجود ندارد،در صورتی که مایل به دریافت  تصاویری از ان قبل از خرید هستید، می توانید با پشتیبانی تماس حاصل فرمایید
  • پس از پرداخت هزینه ،ارسال آنی پاورپوینت خرید شده ، به ادرس ایمیل شما و لینک دانلود فایل برای شما نمایش داده خواهد شد
  • در صورت  مشاهده  بهم ریختگی احتمالی در متون بالا ،دلیل آن کپی کردن این مطالب از داخل اسلاید ها میباشد ودر فایل اصلی این پاورپوینت،به هیچ وجه بهم ریختگی وجود ندارد
  • در صورتی که اسلاید ها داری جدول و یا عکس باشند در متون پاورپوینت قرار نخواهند گرفت.
  • هدف فروشگاه کمک به سیستم آموزشی و یادگیری ، علم آموزان میهن عزیزمان میباشد. 


 

 

 « پرداخت آنلاین و دانلود در قسمت پایین »




دانلود با لینک مستقیم


پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

دانلود پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

اختصاصی از یارا فایل دانلود پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری دانلود با لینک مستقیم و پر سرعت .

 

دسته بندی : پاورپوینت 

نوع فایل:  ppt _ pptx

( قابلیت ویرایش )

 


 قسمتی از محتوی متن پاورپوینت : 

 

تعداد اسلاید : 27 صفحه

ارزیابی کیفیت اجرایی ماشین های حفاری Performance of roadheader The roadheader production rate and bit costs are controlled by several parameters including: Rock parameters, such as rock compressive and tensile strength, percent of hard and abrasive mineral content ( i.e.
quartz), rock fabric and matrix type, and elastic behavior of rock material etc. Ground condition, such as degree of fracture (RQD), joint condition, ground water, fault zones, rock mass classification and support requirements etc. Machine specification, including machine weight, cutterhead power, sumping, arcing, lifting, and lowering forces, cutterhead type(axial or transverse), bits type, size, and other characteristics, number and allocation of bits on the cutter head etc. Operational parameters, such as shape, size, and length of opening, inclination, sequence of cutting and enlargement operation, number of rock formations in the tunneling path, ground support method, and work schedule meaning of number of shifts per day and days per week etc.
1- machine parameter Solution for increasing of performance: Change in material and design of bits. Improve the machine design. Improve the cutterhead design.
The most important parameter to Improve the machine design is stability .
Improve the cutterhead design 2-Geomechanical parameter Case study in Turkey The Hereke Tunnel, located in Turkey in the city of Kocaeli next to Istanbul. The tunnel included 50 m of horizontal section ( 0–50 m), where excavation started up, and 225 m of 9 inclined section ( 50–275 m). sedimentary formations including dry ( 0–50 and 150–275 m) and wet sections (50–150). Excavation was performed by using a shielded roadheader, Herrenknecht-SM1 with 90 kW of cutter head power, in the excavation diameter of 3.48 m. Geological cross-section Effect of rock strength Samples taken from zone 5 have compressive strength of 210 kg/cm2 and specific energy of 11.2 MJ/m3, and samples taken from zone 6 have compressive strength values of 450 kg/cm2 and specific energy values of 16.3 MJ/m3.
This is reflected in instantaneous cutting rate values being 25 solid bank m3/cutting hour in zone 5 and 20 solid bank m3/cutting hour in zone 6. Other research The effect of wet sticky zone Zone 2 water ingress =11 1/min Al2O3 content=2.68 UCS=210kg/cm2 water absorption=3.8% ICR=50 m3/cutting hour Zone 3 water ingress =11 1/min Al2O3 content=15.10 UCS=210kg/cm2 water absorption=18.1% ICR=20 m3/cutting hour Effect of quartz content Roadheader performance analysis Result PR ( penetration rate)=distance excavated / time of excavation AR ( advance rate)= distance excavated / total time U ( utilization )= AR/PR (time of excavation / total

  متن بالا فقط قسمتی از محتوی متن پاورپوینت میباشد،شما بعد از پرداخت آنلاین ، فایل را فورا دانلود نمایید 

 


  لطفا به نکات زیر در هنگام خرید دانلود پاورپوینت:  توجه فرمایید.

  • در این مطلب، متن اسلاید های اولیه قرار داده شده است.
  • به علت اینکه امکان درج تصاویر استفاده شده در پاورپوینت وجود ندارد،در صورتی که مایل به دریافت  تصاویری از ان قبل از خرید هستید، می توانید با پشتیبانی تماس حاصل فرمایید
  • پس از پرداخت هزینه ،ارسال آنی پاورپوینت خرید شده ، به ادرس ایمیل شما و لینک دانلود فایل برای شما نمایش داده خواهد شد
  • در صورت  مشاهده  بهم ریختگی احتمالی در متون بالا ،دلیل آن کپی کردن این مطالب از داخل اسلاید ها میباشد ودر فایل اصلی این پاورپوینت،به هیچ وجه بهم ریختگی وجود ندارد
  • در صورتی که اسلاید ها داری جدول و یا عکس باشند در متون پاورپوینت قرار نخواهند گرفت.
  • هدف فروشگاه پاورپوینت کمک به سیستم آموزشی و رفاه دانشجویان و علم آموزان میهن عزیزمان میباشد. 


 

دانلود فایل  پرداخت آنلاین 


دانلود با لینک مستقیم


دانلود پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

اختصاصی از یارا فایل پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری دانلود با لینک مستقیم و پر سرعت .

پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری


پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

 

دسته بندی : پاورپوینت 

نوع فایل:  ppt _ pptx

( قابلیت ویرایش )

 


 قسمتی از محتوی متن پاورپوینت : 

 

تعداد اسلاید : 27 صفحه

ارزیابی کیفیت اجرایی ماشین های حفاری Performance of roadheader The roadheader production rate and bit costs are controlled by several parameters including: Rock parameters, such as rock compressive and tensile strength, percent of hard and abrasive mineral content ( i.e.
quartz), rock fabric and matrix type, and elastic behavior of rock material etc. Ground condition, such as degree of fracture (RQD), joint condition, ground water, fault zones, rock mass classification and support requirements etc. Machine specification, including machine weight, cutterhead power, sumping, arcing, lifting, and lowering forces, cutterhead type(axial or transverse), bits type, size, and other characteristics, number and allocation of bits on the cutter head etc. Operational parameters, such as shape, size, and length of opening, inclination, sequence of cutting and enlargement operation, number of rock formations in the tunneling path, ground support method, and work schedule meaning of number of shifts per day and days per week etc.
1- machine parameter Solution for increasing of performance: Change in material and design of bits. Improve the machine design. Improve the cutterhead design.
The most important parameter to Improve the machine design is stability .
Improve the cutterhead design 2-Geomechanical parameter Case study in Turkey The Hereke Tunnel, located in Turkey in the city of Kocaeli next to Istanbul. The tunnel included 50 m of horizontal section ( 0–50 m), where excavation started up, and 225 m of 9 inclined section ( 50–275 m). sedimentary formations including dry ( 0–50 and 150–275 m) and wet sections (50–150). Excavation was performed by using a shielded roadheader, Herrenknecht-SM1 with 90 kW of cutter head power, in the excavation diameter of 3.48 m. Geological cross-section Effect of rock strength Samples taken from zone 5 have compressive strength of 210 kg/cm2 and specific energy of 11.2 MJ/m3, and samples taken from zone 6 have compressive strength values of 450 kg/cm2 and specific energy values of 16.3 MJ/m3.
This is reflected in instantaneous cutting rate values being 25 solid bank m3/cutting hour in zone 5 and 20 solid bank m3/cutting hour in zone 6. Other research The effect of wet sticky zone Zone 2 water ingress =11 1/min Al2O3 content=2.68 UCS=210kg/cm2 water absorption=3.8% ICR=50 m3/cutting hour Zone 3 water ingress =11 1/min Al2O3 content=15.10 UCS=210kg/cm2 water absorption=18.1% ICR=20 m3/cutting hour Effect of quartz content Roadheader performance analysis Result PR ( penetration rate)=distance excavated / time of excavation AR ( advance rate)= distance excavated / total time U ( utilization )= AR/PR (time of excavation / total

  متن بالا فقط قسمتی از محتوی متن پاورپوینت میباشد،شما بعد از پرداخت آنلاین ، فایل را فورا دانلود نمایید 

 


  لطفا به نکات زیر در هنگام خرید دانلود پاورپوینت:  توجه فرمایید.

  • در این مطلب، متن اسلاید های اولیه قرار داده شده است.
  • به علت اینکه امکان درج تصاویر استفاده شده در پاورپوینت وجود ندارد،در صورتی که مایل به دریافت  تصاویری از ان قبل از خرید هستید، می توانید با پشتیبانی تماس حاصل فرمایید
  • پس از پرداخت هزینه ،ارسال آنی پاورپوینت خرید شده ، به ادرس ایمیل شما و لینک دانلود فایل برای شما نمایش داده خواهد شد
  • در صورت  مشاهده  بهم ریختگی احتمالی در متون بالا ،دلیل آن کپی کردن این مطالب از داخل اسلاید ها میباشد ودر فایل اصلی این پاورپوینت،به هیچ وجه بهم ریختگی وجود ندارد
  • در صورتی که اسلاید ها داری جدول و یا عکس باشند در متون پاورپوینت قرار نخواهند گرفت.



دانلود فایل  پرداخت آنلاین 


دانلود با لینک مستقیم


پاورپوینت ارزیابی کیفیت اجرایی ماشین های حفاری

حفاری توأم با بتن ریزی

اختصاصی از یارا فایل حفاری توأم با بتن ریزی دانلود با لینک مستقیم و پر سرعت .

حفاری توأم با بتن ریزی


حفاری توأم با بتن ریزی

مقالات  عمران  با فرمت           DOC           صفحات  27

مقدمه :

روشهای متعددی برای تولید لوله در صنعت وجود دارد ، یکی از روشهای مرسوم استفاده از روش اسپیرال می باشد ؛ در این روش ورقها به صورت دایره خم شده و بوسیله جوش اتوماتیک جوشکاری می شود ، اما به دلایل مختلف این لوله ها کمتر در کارهای شم کوبی مورد استفاده قرار می گیرند ، در این تحقیق حفاری توأم با بتن ریزی مورد ارزیابی و مقایسه قرار گرفته است .، که آزمایشات شم کوبی ع حفاری ، بتن ریزی و بارگذاری استاتیکی به روش ML مورد ارزیابی و تجدید نظر قرار گرفته است .

دراین پروژه به بررسی فونداسیون ها ی عمیق که به منظور دستیابی به تراکم ، بالابردن نیروهای پیچیده ارزی که گستره ی گوناگون ساختاری از قبیل ساختمان ها ، پل ها ، برج ها ، گذرگاهها ، اسکله ها و سکوهای روی زمین و نسب در کرانه ها و دور از کرانه ها طراحی شده ، پرداخته شده است .

و همچنین به شیوه ی نسب شافت ها  در محل اجرا اشاره می شود که مراحل اجرای آن عبارتند از :

 1- حفاری محل  نصب و ایجاد حفره درون زمین تا عمق مورد نظر برای قرارگیری شافت .

2- پر کردن انتهای حفره با بتن

3- قرار دادن قفسه میلگرد درون حفره .

4- بتن ریزی حفره .


مراحل اجرای شمع بتنی درجا:

  • ساخت سبد آرماتور و لقمه های بتنی جهت رعایت پوشش آرماتور جداره شمعها.
  • اتصال لقمه های بتنی به سبد آرماتور هر 2 متر و در هر چهار طرف سبد. ( البته این میزان به در نقشه های اجرائی قید می شود ولی برای شمع های حدود 10 متر و بالاتر, اتصال لقمه معمولاً به ازای هر 2 متر می باشد.
  • میخکوبی محل آکس شمع مورد نظر.
  • تایید دستگاه نظارت, در تمامی مراحل اجرای پروژه اژن بند از اساسی ترین موارد اجرا به شمار می آید.
  • استقرار دستگاه حفاری در محل حفاری.
  • حفاری تا عمق مورد نظر
  • کیسینگ گذاری جهت جلوگیری از ریزیش خاک دستی به درون محل حفاری در صورت نیاز.
  • ساخت بنتونیت: در صورت ریزشی بودن دیوار محل حفاری شمع به مدت حداقل یک روز قبل از حفاری.
  • ریختن بنتونیت در صورت نیاز در طول مدت حفاری.

10- حمل سبد بافته شده آرماتور به محل حفاری.

11- قراردادن سبد آرماتور در داخل محل حفاری توسط جرثقیل.

12- ساخت بتن توسط بچینگ در کارگاه مطابق با مشخصات فنی.

13 حمل بتن توسط تراک میکسر از محل بچینگ تا محل حفاری.

14- نصب لوله ترمی به جرثقیل جهت بتن ریزی.

 


دانلود با لینک مستقیم


حفاری توأم با بتن ریزی

دانلود کارآموزی حفاری مراحل اجرای یک سیکل کاری از ابتدا تا انتها‏

اختصاصی از یارا فایل دانلود کارآموزی حفاری مراحل اجرای یک سیکل کاری از ابتدا تا انتها‏ دانلود با لینک مستقیم و پر سرعت .

دانلود کارآموزی حفاری مراحل اجرای یک سیکل کاری از ابتدا تا انتها‏


دانلود کارآموزی حفاری مراحل اجرای یک سیکل کاری از ابتدا تا انتها‏

دسته بندی : کارآموزی _ کارورزی ،

فرمت فایل:  Image result for word ( قابلیت ویرایش و آماده چاپ

فروشگاه کتاب : مرجع فایل 

 


 قسمتی از محتوای متن ...

تعداد صفحات : 34 صفحه

در این گزارش مراحل اجرایی یک سیکل کاری از ابتدا تا انتها مورد بررسی قرار خواهد گرفت.
قرائت (نقشه برداری): از جمله مسائلی که توسط تیم نقشه برداری هدایت می شود، هدایت حفاری می‌باشد.
از آنجایی که این تونل از دو طرف در دو سینه کاری جدا حفر شده در نتیجه از طریق عملیات دقیق نقشه برداری باید پیش رفت تا در نهایت از هر دو طرف به یک قسمت برسیم.
از دیگر وظایف این گروه تعیین خط برش است که در آن محدوده و با توجه به آن باید عملیات حفاری صورت گیرد.
روند تعیین این خطبدین صورت است که ابتدا دوربین (total station) را نسبت به محل توجیه کرده سپس بر مبنای آن و تعریفی که از موقعیت تونل دارند موقعیت محدوده حفاری آنالیز می گردد و در نهایت از طریق اسپری های رنگی این محدوده مشخص شده که در مرحله بعدی چالهای حفاری با توجه به قدرت آتشباری باید در درون آن اجراء شده و سپس خرج‌گذاری و آتشباری صورت گیرد.
کنترل این محدوده قبل از مرحله نگهداری دوباره صورت می گیرد که تا در صورت انحراف آنرا اصلاح نمایند.
1- حفاری و آتشباری با توجه به روش و الگوی طراحی شده جهت آتشباری (پیوست 1-1) عملیات حفاری چالهای آتشباری با طول متر و قطر 51 میلی متر با فواصل مشخص توسط دستگاه جامبودریل به روش ضربه‌ای- چرخشی صورت می گیرد و در ادامه بعداز تخلیه کلیه پرسنل و تجهیزات از محل عملیات خرج گذاری و آتشباری به روش v.
cut صورت می پذیرد.
در این روش از دینامیت اخگر و همچنین از کرتکس در چالهای اطراف جهت آتشباری کنترل شده استفاده می گردد، تا از بروز اضافه حفاری جلوگیری شود.
در مرحله بعدی بعد از تهویه گازهای سمی حاصل و کنترل محل توسط تیم آتشباری (جهت بررسی وجود یا عدم وجود چالهای انفجاری عمل نکرده) در صورت وجود مناطق تخریب نشده از رود هدر استفاده می گردد.
البته مناطقی که از لحاظ جنس جزء مناطق نرم باشند بدون عملیات آتشباری توسط رود هدر حفاری می گردد.
البته با توجه به تکتونیزه و ریزشی بودن منطقه بهتر بود که از روش آتشباری استفاده نگردد و یا آنکه در نوع و روش آتشباری تجدید نظر نموده و از آتشباری کنترل شده به روش صحیحی استفاده گردد.
2- تهویه با توجه به وجود گازهای No2,Co2,Co و گرد زغال و گاز گریز و در مناطق زغال‌دار و همچنین وجود دو ده حاصل از ماشین آلات بارگیری و حمل و نقل تهویه این تونل جزء مسائل عمده و اساسی می باشد.
  متن بالا فقط تکه هایی از محتوی متن مقاله میباشد که به صورت نمونه در این صفحه درج شدهاست.شما بعد از پرداخت آنلاین ،فایل را فورا دانلود نمایید 

 

 


  لطفا به نکات زیر در هنگام خرید دانلود مقاله :  توجه فرمایید.

  • در این مطلب،محتوی متن اولیه قرار داده شده است.
  • به علت اینکه امکان درج تصاویر استفاده شده در ورد وجود ندارد،در صورتی که مایل به دریافت  تصاویری از ان قبل از خرید هستید، می توانید با پشتیبانی تماس حاصل فرمایید.
  • پس از پرداخت هزینه ،ارسال آنی مقاله یا تحقیق مورد نظر خرید شده ، به ادرس ایمیل شما و لینک دانلود فایل برای شما نمایش داده خواهد شد.
  • در صورت  مشاهده  بهم ریختگی احتمالی در متون بالا ،دلیل آن کپی کردن این مطالب از داخل متن میباشد ودر فایل اصلی این ورد،به هیچ وجه بهم ریختگی وجود ندارد.
  • در صورتی که محتوی متن ورد داری جدول و یا عکس باشند در متون ورد قرار نخواهند گرفت.
  • هدف اصلی فروشگاه ، کمک به سیستم آموزشی میباشد.

دانلود فایل   پرداخت آنلاین 


دانلود با لینک مستقیم


دانلود کارآموزی حفاری مراحل اجرای یک سیکل کاری از ابتدا تا انتها‏